Industrial Cooling Tower
Water savings in a 500 Ton cooling tower
A 500 ton cooling tower in North Carolina was using 4,587,900 gallons
annually. The water was chemically treated to prevent scaling.
After the installation of the non invasive electronic product to prevent
scaling without the use of chemicals the water consumption was reduced
to 2,086,400 the next year. This is a savings of roughly 50 %.
At a price of water/sewage of $0.007/gallon this represents a total
saving of $17,510 each year. By setting the TDS controller to a set
point of 1800 PPM instead of 1600 PPM the savings became even more.
The approach temperature in the chiller condenser is now running at 3.5
-3.8 degrees which is the same when the cooling system was installed,
indicating the absence of scale build-up.
The
system uses electric and magnetic fields to promote crystal growth in
the bulk of the water. Crystals do not have a surface charge and will
therefore not adhere to pipe walls or other surfaces. They float with
the water until discharged by regular blow down. As chemical scale
inhibitors increase the electrical conductivity (EC) of the cooling
water very quickly, blow down starts as soon as the set point of the EC
level is reached in an automated blow down system. By not using these
chemicals it will take longer before the set point is reached and that
is where the savings come from. In addition the set point can be set at
a higher level, generating even more savings.
In my opinion it should be compulsory (enforced by law) to install this
kind of scale preventing devices making it possible to use less or no
chemicals. Total water savings in the United States will be beyond
imagination. |
|
Commercial Heater
- Automotive Parts
Manufacturer
Washers & Heating Elements
9/12/2007
It isn’t very often you come across a product that actually does
everything that it claims to. After fighting with scale and other
contributing factors causing heaters to prematurely fail and
exceptionally long periods of downtime for cleaning, I was able to sell
the idea of this new technology to my manager.
I researched the product and the theory was sound, but how about in
practical application. Within 3 weeks after installing the unit I was
able to knock scale buildup off of one of our parts washers with my
finger. This may seem insignificant until you realize that prior to this
a pressure washer and putty knife wouldn’t put a dent in it. Since we
began using this unit we have not replaced a single heating element
compared with at least 3-4 heaters
every 2 months. It has also helped us maintain a 60% duty cycle on our
heaters compared to an 85%-90% duty cycle prior to using this unit.
Being from the Midwest we know about water with high calcium and lime
content. I am considering buying one for my home.
Thanks for the great product.
Maintenance Department Engineer
Mitsuba Bardstown Inc.
901 Withrow Court Bardstown, Kentucky 40004,
U.S.A. |